Author Topic: IRC calculation  (Read 7137 times)

marcel

  • Newbie
  • *
  • Posts: 2
  • Karma: +0/-0
IRC calculation
« on: September 09, 2008, 10:28:17 PM »
Hi

I am trying to do an IRC calculation on my system. As I found out so far this option only exists in Gaussian.
So I would like to know if there is a similar calculation type in TM?
Or do I just need to assign the transition vector and do a normal geometry optimization following this vector using the jobex script.
If yes, how could I specify the direction to follow this vector?
I would be more than happy if anybody could help me out with this.

Thanks in advance

Marcel